Industrial
Completed
Industrial Warehouse Complex
Large-scale warehouse and distribution center with advanced logistics systems.
Kempton Park, Gauteng
Completed 2024

Project Specifications
Technical Details
Total Area
35,000 m²
Floors
2 floors
Duration
15 months
Budget
R65 million
Key Features
High-bay warehouse storage
Automated conveyor systems
Loading dock facilities (20 bays)
Office and administrative areas
Temperature-controlled sections
Advanced security systems
Solar panel installation
Fire suppression systems
Equipment Used
Professional-grade construction equipment and machinery used in this project

Heavy Lifting
Mobile Crane 100T
• Lifting capacity: 100 tons
• Boom length: 60 meters
• Used for: Steel frame erection
• Reach: 50 meters

Material Handling
Forklift Fleet
• Capacity: 3-5 tons each
• Lift height: 6 meters
• Used for: Material placement
• Fleet size: 8 units
Project Timeline
Detailed timeline showing each phase of the construction process
Foundation & Structure
6 monthsFoundation work and steel frame construction
Completed
Building Envelope
4 monthsWalls, roofing, and weatherproofing
Completed
Systems Installation
3 monthsMechanical, electrical, and automation systems
Completed
Fit-out & Testing
2 monthsInterior fit-out and system commissioning
Completed
Project Gallery
Visual documentation of the construction process and final results






Project Team
Meet the dedicated professionals who brought this project to life
James Wilson
Industrial Project Manager
22+ years
james@ruijieengineer.co.za
+27 11 234 5685