Residential
Completed
Luxury Housing Development
Premium residential complex featuring 50 units with modern architecture and landscaping.
Sandton, Gauteng
Completed 2023

Project Specifications
Technical Details
Total Area
25,000 m²
Floors
3 floors per unit
Duration
24 months
Budget
R85 million
Key Features
50 luxury residential units
Private gardens for each unit
Community clubhouse and pool
24/7 gated security
Underground parking
Solar panel installations
Smart home automation
Landscaped common areas
Equipment Used
Professional-grade construction equipment and machinery used in this project

Earthmoving
Excavator CAT 320
• Operating weight: 20 tons
• Bucket capacity: 1.2 m³
• Used for: Site excavation
• Fuel efficiency: 15L/hour

Concrete Equipment
Concrete Pump Truck
• Boom reach: 32 meters
• Output: 90 m³/hour
• Used for: Foundation pours
• Pressure: 85 bar

Lifting Equipment
Mobile Crane 50T
• Lifting capacity: 50 tons
• Boom length: 40 meters
• Used for: Precast installation
• Mobility: All-terrain
Project Timeline
Detailed timeline showing each phase of the construction process
Planning & Permits
4 monthsDesign finalization, permit acquisition, and site preparation
Completed
Infrastructure Development
6 monthsRoads, utilities, and basic infrastructure for the development
Completed
Unit Construction
10 monthsIndividual unit construction including structure and roofing
Completed
Finishing & Landscaping
4 monthsInterior finishing, exterior work, and landscape development
Completed
Project Gallery
Visual documentation of the construction process and final results






Project Team
Meet the dedicated professionals who brought this project to life
Michael Johnson
Development Manager
18+ years
michael@ruijieengineer.co.za
+27 11 234 5681
Lisa Wong
Residential Architect
14+ years
lisa@ruijieengineer.co.za
+27 11 234 5682